Introduction

COP31 should be judged in two parts. Politically, it failed. The proposed Antalya Pact could not command consensus after the text dropped direct language on fossil fuels and offered too little certainty on adaptation finance. The conference ran two days beyond its scheduled close and ended without either presidency-led cover decision. Simon Stiell called the outcome a deep disappointment.[1]

Institutionally, however, the process did not collapse. Parties adopted decisions on the Global Goal on Adaptation, the UAE Just Transition Work Program, long-term climate finance, the Green Climate Fund, loss and damage, technology, and all three strands of Article 6. The Action Agenda also produced a sizeable electrification package. Overall, COP31 failed at the level of political direction but continued with much of the bureaucracy through which climate policy is implemented.[2]

No Antalya Pact means weaker political momentum. But, it does not suspend the Paris Agreement, the EU CBAM or the economics of solar and storage. Pakistan should expect a more fragmented transition, with pressure arriving through markets and regulatory push (such as the SBP and SECP) rather than through a grand COP decision.

What failed in Antalya

The final disagreement was presented as a dispute over fossil-fuel language, but the fault line was wider. A coalition including the EU, small island states and vulnerable countries rejected a text that would not name the main source of warming and did not provide enough confidence on finance. Other developing-country groups considered the package weak but were prepared to accept it to preserve consensus. Fossil-fuel exporters resisted language that narrowed future demand and defended a larger role for carbon capture.[3]

This was not a neat North-South divide. Many vulnerable countries wanted both stronger mitigation and more finance. Some developing countries placed greater weight on immediate implementation support and flexibility in transition pathways. Developed economies asked for higher ambition while remaining constrained on public finance. The barrier this time around was hard to push over. Developing countries do not trust finance promises, while developed parties (such as EU) increasingly reject texts that soften previous commitments on fossil fuels.

Pakistan at Antalya

Pakistan’s position was consistent with its long-standing priorities. It emphasised grant-based finance, adaptation and resilience funding that does not deepen sovereign debt. It also favoured preserving consensus rather than joining the group that blocked the pact.[4] It continued to advocate for multilateral system more than most. But the lesson from Antalya is that advocacy around vulnerability, by itself, will not close the financing gap. Pakistan also needs projects, data and institutions that can convert political recognition into transactions. We believe that projects like Savak will continue to provide the much-needed investability and bankability that Pakistan need at a project level to attract broad based climate finance.

What still works

The adopted decisions are more substantial than the headlines suggest. The Global Goal on Adaptation survived. The just-transition work programme will continue with a mechanism for cooperation, technical assistance and knowledge sharing. Guidance was adopted for the Fund for Responding to Loss and Damage. Article 6.2, 6.4 and 6.8 all moved forward.[2]

For Pakistan, Article 6 is commercially important. The country already has policy guidelines for carbon trading, a designated authority and an approval process. Pakistan needs to move fast on execution now: predictable decisions, a functioning registry, credible baselines and a pipeline of projects that can survive validation and buyer diligence.[5] COP31 provides continuity in the international rules but a sovereign will have to turn weak projects into bankable projects at a country level.

The same distinction applies to electrification. The COP31 Action Agenda assembled commitments involving more than 150 countries, the EU, 37 cities and over 260 businesses, linked to a voluntary goal of raising electricity’s share of final energy use to 35 per cent by 2035.[6] The failed cover decision limits the political force of that goal but some countries, such as China and Pakistan are far ahead in the deployment curve than most. Electrification of everything is the right economic decision and any push to foster this forward should be appreciated.

Trade exposure could widen

The immediate corporate mistake would be to read Antalya as a pause in transition risk. For Pakistani exporters, the most consequential climate institutions are increasingly customs authorities, buyers, banks and supply-chain standards. The EU’s Carbon Border Adjustment Mechanism entered its definitive phase on 1 January 2026. It currently covers cement, iron and steel, aluminium, fertilisers, electricity and hydrogen. Textiles are not covered.[7]

EU-Pakistan goods trade reached EUR 12.2 billion in 2025, and EU imports from Pakistan were about EUR 8.7 billion. More than 85 per cent of Pakistan’s exports receive duty- and quota-free access under GSP+, with textiles and clothing at the centre of that relationship.[8] Even without textile coverage under CBAM, large buyers and lenders increasingly need auditable information on energy, emissions, water and traceability.

For cement, steel, aluminium and fertiliser producers, carbon measurement is already part of market access. The sensible response is not another broad net-zero pledge. It is verified facility-level data, a clear marginal abatement cost curve, and investment decisions on alternative fuels, clinker substitution, waste heat, renewable power and efficiency. For textile groups, the same capabilities protect buyer relationships and financing access before regulation reaches the sector.

Climate finance will remain scarce and specific

Antalya should reduce expectations of abundant concessional finance. Pakistan needs an estimated USD 348 billion for climate-resilient and low-carbon development by 2030, while about USD 4 billion is currently mobilised each year. Domestic private sources account for roughly 5 per cent and adaptation finance meets only about 6 per cent of national needs.[9] The gap is too large to be closed by announcements at a COP.

Finance is available, but it will attach to defined risks and cash flows. The UK-IFC CIFPAK facility combines GBP 90 million of concessional capital with a target of mobilising more than GBP 420 million in private investment. Its priorities include resilient infrastructure, water, climate-smart agriculture, renewable energy and disaster-risk reduction.[9] Firms that can present investable projects, reliable data, credible counterparties and a precise use for concessional risk capital will foster well.

Also, Pakistan’s strongest climate-finance proposition is a shorter pipeline of prepared projects with land, permits, feasibility, safeguards, revenue models and an identified financing gap. The Pakistan Pavilion discussed many of the right themes, including blended finance, investment pipelines, distributed solar, disaster-risk finance and carbon markets.[10] The measure of success before COP32 should be how many of those discussions reach term sheet, approval and financial close.

Adaptation is a balance sheet issue

Pakistan loses an estimated USD 2 billion a year to disasters, while insurance penetration is only 0.7 per cent of GDP. In 2026, ADB approved a USD 700 million insurance-sector reform programme and USD 500 million in contingent disaster financing.[11] These are signs of where the financial architecture is moving: pricing, transferring and pre-financing physical risk rather than relying almost entirely on relief after an event.

For banks, flood and heat exposure should affect collateral assessment, tenor, covenants and pricing. Similarly, insurers have room to build parametric cover and risk pools supported by better data. Companies should treat drainage, cooling, water security, backup power and supplier redundancy as capital-allocation questions. The cost of adaptation should now be seen with cost of avoided losses also.

Solar has moved ahead of policy

Pakistan’s solar boom has proceeded without multilateral permission. By June 2026, cumulative module imports had reached 58 GW, net-metered capacity was only 7.3 GW, and lithium-ion battery imports exceeded USD 1 billion.[12] SBP estimates that solarisation saved USD 4.5-5.5 billion in net energy imports in FY26. Much of the transition is behind the meter and ahead of the grid, tariff system and official statistics.

Pakistan offers a practical lesson for 35-by-35. Electrification moved quickly because cheap equipment met high grid prices and households and firms could invest without waiting for public procurement. It was a privately financed, decentralised transition. Nobody waited for grand infrastructure but instead use the modular and distributed infrastructure available. When generation could scale in months, while grids, storage, metering, tariffs and market rules take years, solar deployment took days. Other countries should make distributed investment easy and let the technology take its own push.

What Pakistan should do before COP32

Pakistan does not need to choose between climate diplomacy and domestic delivery. It needs to connect them.

  • Turn the pavilion into a transaction pipeline. Select a small number of priority projects (ideally, 3 only) before the next COP. Each should have an owner, feasibility work, a financing structure, a data room and a defined request to investors or development partners. Pavilion events should support those transactions rather than substitute for them.
  • Operationalize the carbon-market framework. The 2025 policy guidelines provide a base. The next step is operationalizing Rules, including predictable processing of letters of intent, authorizations and corresponding adjustments, supported by a registry and clear public information on eligibility, timelines and fees. Pakistan should protect its NDC while giving credible projects enough certainty to invest.
  • Build an emissions-measurement spine for industry. Priority exporters need facility-level emissions and energy data that can satisfy buyers, banks and carbon-market standards. Government can help by aligning methods, verification capacity and sector benchmarks. Companies should own the underlying data rather than depend on consultants each time a buyer asks.
  • Label adaptation as investment. Large public and private projects should use consistent physical-risk screening. Banks and insurers should translate that information into underwriting and product design. Companies should identify resilience investments alongside ordinary maintenance and expansion capital, with avoided downtime and asset loss included in the business case.
  • Reform the power system through distributed energy and CTBCM. The first 400 MW wheeling auction is the practical start of bilateral contracting, within an approved 800 MW transition.[13] Phase II should lower the current 1 MW threshold, upgrade metering and market systems, deal with stranded and legacy costs, add organised short-term markets and move towards retail competition. NEPRA has asked ISMO for a Market Evolution Design by 31 December 2026 and targets 2030 for Phase II, subject to readiness.[14] Open access will give industrial buyers a route to cleaner power without leaving the grid to carry all fixed costs.

Selected sources

  1. UNFCCC, Closing remarks by Simon Stiell, 22 November 2026. Source
  2. UNFCCC, Outcomes of the Antalya Climate Change Conference, advance unedited decisions. Source
  3. IISD Earth Negotiations Bulletin, COP31 closing plenary, 22 November 2026. Source
  4. Government of Pakistan, Prime Minister’s national statement at COP31, 13 November 2026. Source
  5. Ministry of Climate Change and Environmental Coordination, Pakistan Carbon Market Framework. Source
  6. UNFCCC, COP31 Electrification Delivery Package, 19 November 2026. Source
  7. European Commission, CBAM definitive regime. Source
  8. European Commission, EU trade relations with Pakistan. Source
  9. IFC, UK-IFC Climate Investment Fund Pakistan. Source
  10. Ministry of Climate Change and Environmental Coordination, Pakistan Pavilion programme for COP31. Source
  11. Asian Development Bank, Pakistan insurance and disaster-resilience programmes, 2026. Source
  12. State Bank of Pakistan, The State of Pakistan’s Economy 2025-26. Source
  13. Power Division, Pakistan’s first 400 MW wheeling auction under CTBCM. Source
  14. NEPRA, CTBCM final test run and Phase II directions, 15 October 2025. Source